Solana Generation Station Gila Bend

Performance Safety is providing MMC Contractors with up to (3) full time safety professionals as required by Abeinsa EPC / Abengoa Solar Owner. MMC Contractors fabricated and installed multitrade pipe rack systems, the water treatment equipment and the deaerator (DA) Platform piping for the worlds largest solar power generating station currently under construction.

Scope of work includes the Mechanical installation activities covering work activities within the power block of this generation station. We conduct daily pre-task planning, workplace audits, investigate incidents / accidents and provide basic safety training needs for all work activities including material handling, heavy wall and small bore welding and cutting on carbon and stainless steel with up to 180 field personnel.